[1] 雷加强,王雪芹,王德.塔里木沙漠公路风沙危害形成研究[J].干旱区研究,2003,20(1):1-6.
[2] Lei J Q, Li S Y, Jin Z Z, et al. Comprehensive eco-environmental effects of the shelter-forest ecological engineering along the Tarim Desert Highway[J]. Chinese Science Bulletin,2008,53(Supp. II): 190-202.
[3] 郭建青,李彦,王洪胜,等.含水层抽水试验水位恢复过程数据的直线图解分析法[J].水利学报,2004(10):22-26.
[4] Jacob C E. Correlation of ground-water levels and precipitation on Long Island, New York, Part 1, Theory[J]. Am. Geophys. Union, 1944(24):564-573.
[5] Carrera J, Neuman S. P. Estimation of aquifer parameters under transient and steady state conditions: 2. Uniqueness, stability, and solution algorithms[J]. Water Resour. Res,1986,22(2):211-227.
[6] Boulton N S. Analysis of data from non-equilibrium pumping tests allowing for delayed yield from storage[C]. Ice Virtual Library, 1963:469-482.
[7] 薛禹群.地下水动力学[M].北京:地质出版社,2009.
[8] 中华人民共和国水利部.水电水利工程钻孔抽水试验规程(SL320-2005)[M].西安:陕西人民教育出版社,2005.
[9] Fan J L, Xu X W, Lei J Q, et al. The temporal and spatial fluctuation of the groundwater level along the Tarim desert highway [J]. Chinese Science Bulletin,2008(Supp. II):53-62.
[10] 滕东方.白洞水文孔稳定流抽水及注水试验成果分析[J]. 同煤科技,2004(004):3-5.
[11] 邹立芝,杨昌兵,侯杰.关于给水度的定义[J].水文地质工程地质, 1994,21(001):31-33.
[12] 李佩成.地下水动力学[M].北京:农业出版社,1993.
[13] 豆秀梅,卢西魁.全站仪三角高程精度分析 [J].科技信息,2007 (06X):14-15.
[14] 陈文杰.基于 MapGIS 的 DTM模型应用——以矿产储量计算为例[J].城市地质,2009,3(4):37-40.
|